El proceso duró 2 semanas. Acudí a una entrevista en Intel Corporation (Hudson, MA) en jul 2011
Entrevista
Received 1 technical phone screen with questions derived from my resume with a few higher level what-if questions. The interviewer was on time with our agreed upon time for the phone conversation. The next step took a little longer because of the July 4th holiday weekend, but was scheduled about 3 weeks after the initial screen. The onsite interview consisted of 3 1hr 1:1s very technical in nature designed to find my breaking point. An off-site lunch with the hiring manager was nice and casual. Compensation expectations were discussed on the ride back to campus. 3 more 1hr 1:1s were scheduled with a different design group and were equally as challenging. I was impressed with the caliber of people that interviewed me and felt like I did very well answering the questions.
Preguntas de entrevista [2]
Pregunta 1
In Verilog what is the difference between a blocking and non-blocking statement?
Acudí a una entrevista en Intel Corporation (Santa Clara, CA)
Entrevista
Questions on physical design concepts , syn and apr
Sta questions about constraints
Concepts of transistor physics
Phone screen, multiple round, followed by conversation with the hiring manager
Overall good experience
Acudí a una entrevista en Intel Corporation (Chandler, AZ)
Entrevista
Five engineers, a manager and director asked medium level engineering and architecture questions including proof of structured coding and design skills. Each interviewer had varying questions. They rated at 0 (won’t work with candidate), 1 (adequate) or 2 (exceptional hire) for a team survey of votes to compare multiple candidates.
Preguntas de entrevista [1]
Pregunta 1
Design a state machine to control a four way intersection of varying time traffic lights.
long but effective. 4 rounds of interviews ( quiz questions, computer architecture, past projects, leadership experience, basic algorithm questions, coding, etc.) each last 40 min. results came back after 10 days