Envié una solicitud electrónica. El proceso duró 2 meses. Acudí a una entrevista en Enerpac Tool Group (Spring Grove, IL)
Entrevista
The interview was multiple people. HR, then Engineering and Production. Despite spending almost 4 hours on site, I never heard back. Not even a rejection email. Very low class