Envié una solicitud electrónica. El proceso duró 2 semanas. Acudí a una entrevista en Eaton (Waukesha, WI) en may 2021
Entrevista
I had a phone screen with the hiring manager. After this I had an in person scheduled. The first part was with HR, then I met with the hiring manager and two engineers.
Preguntas de entrevista [1]
Pregunta 1
How can you improve the overall efficiency of low volume work?
I had two back-to-back about 30 min interviews with different employees from Eaton. It was conducted online due to covid. Both were engineers, and I was able to ask questions related to their work.