Envié una solicitud electrónica. El proceso duró 1 día. Acudí a una entrevista en Avail Infrastructure Solutions (Richland, MS) en ene 2025
Entrevista
On site. 3 people. there was hr, engineering manager, and coordinator. It was in a long table. It was in Mississippi. It was fun. We walked through the facility. There was a skills test. The skills test was on inventor.