A good start for my career in UAE: opiniones de empleados con el puesto de Senior Project Controls Engineer en Archirodon

3,0
12 feb 2025
Recomendar
Aprobación del CEO
Perspectiva de la empresa

Ventajas

work environment is not hard or tough

Desventajas

too much Projectized environment, with over authority for PM over everything without control, audit, or even support from senior management

Echa un vistazo a otras opiniones sobre Archirodon.

4,0
4 abr 2021
Recomendar
Aprobación del CEO
Perspectiva de la empresa

Ventajas

Good salary comparing to the market High level of stability

Desventajas

No KPIs Promotion based on number of spent years not on progress achieved

1
5,0
7 abr 2026
Recomendar
Aprobación del CEO
Perspectiva de la empresa

Ventajas

• Mechanical Engineer having 36 Years of Experience in fields of Executing to Tender. Bidding, Engineering, Procurement, Construction,Workover Engineering, hook up, hydro test. Commission of Cross country (Oil & Gas) pipelines, Flow lines, Refinery & Petrochemicals Expansion, Chemical process Plant, Rig Plot, Xmas-Tree. well head, Water well injection, Oil tanking terminal facility, MEP Project, Captive and Cogeneration power Plant. Processing and hydrocarbon handling facilities with exposure to long-distance pipeline and booster station systems. • International Projects of Oil &Gas processing, Water & Waste water Treatment, ITR control , Blast rates &specialized Building, Jacksers,top side, Anchor piles ,offshore Bridges, Skids,. package, modular solution, Automation control (PLC,SCADA,DCS), Remote control stations,SIS (F&G,ESD,SIS,HIPPS). • Budgeting, cost control, & variance analysis, Drive cost optimization & efficiency Variations,changeorders&claimsmanagement.QSPipelineprojects(MRICS/AIQS)Risk,Stakeholder,CommunicationManagementPlan,Review, monitor project baseline schedules, claims, variations • Pumps, Valves. Air compressor, HVAC works includs ducting, chilled water piping, and equipment installation. plumbing, drainage, water supply system installations..BIM, FM200System, NFPA14Fire Hydrant System • API 620 tank, API 650 Editions 12, 2013 , Cone Roof Tank, 60Meter,Dome Roof Tank, Internal Floating Roof, Floating roof tank,ASME SEC. 8, DIV1 ,Carbon Steel Storage Tank for JET A1 Fuel Storage. Crude oil, Gasoline , components

Desventajas

No Concern • Project Planning, Scheduling, Cost control, Man-hour control, Resource cost and utilization • Risk Analysis & Mitigation Plan, Root Cause analysis, identify and Execute the Corrective Action • Managing MRs, vendor offer reviews, TQs/ TBE, PO award, spares management • Ensure quality checks and Progress tracking of design activities performed in the 3D environment

Ver opiniones por: Útil|Valoración|Fecha|Todo