Envié una solicitud electrónica. El proceso duró más de 1 semana. Acudí a una entrevista en Will-Burt (Orrville, OH)
Entrevista
Phone interview with HR with basic HR questions. Second interview with the Director of Engineering was very thorough and included a personality test and a plant tour. The second interview took about 2 hours or so. Came back for a third interview with the Engineering manager for about an hour and was hired within a week.
Preguntas de entrevista [1]
Pregunta 1
They asked about how I dealt with a difficult situation in the past. They were very interested in how you deal with conflict.