Preguntas de entrevista de Civil engineer

2 mil

Preguntas de entrevista para Civil Engineer compartidas por los candidatos

Principales preguntas de entrevista

Ordenar: Relevancia|Popular|Fecha
Brigade Enterprises
A un Civil Engineer le preguntaron...25 de junio de 2012

What is water cement ratio?

11 respuestas

w/c is the ratio between water and cement in the concrete mix

The volume of water to volume of cement

0.45 to 0.60 kg

Mostrar más respuestas
Network Rail

Why are you interested in Network Rail and the graduate scheme?

9 respuestas

I went to an AC on the 20th of Jan, but they still never got back to me. When did you do yours and when did they get back to you? Menos

I got an email from then today saying I have been put on the reserve list

I got the same response yesterday.

Mostrar más respuestas
National Thermal Power

What is the thing that you are most proud of in your life other than from your resume.

6 respuestas

i m proud of my self confidence

i m proud of my self confidence

I am proud of my loyalty.

Mostrar más respuestas
Turner Construction

How do you take criticism ?

6 respuestas

Take it with large mind, it is meant for correction and perfection.

It is meant for thorough checking and executing job to perfection and required standard. Menos

Dont take it personal, think it more like boarder sense

Mostrar más respuestas
Sobha

Are you ready for a 2 year bond?

7 respuestas

Yes

Yes

No.

Mostrar más respuestas
Soma Enterprise

Why you are willing to join in our Company?

7 respuestas

I like to do this job and its my aim

I work with your company

I would like to change the company

Mostrar más respuestas
Gammon India Limited

wat is the m20 component

6 respuestas

characteristic strength of concrete mix designM20 at 28 days

M means Mix and 20 means characteristics strength of concrete after 28 days of curing its proportion is 1:1.5:3 Menos

1:1.5:3-cement: sand:aggregate

Mostrar más respuestas
CPECC

what is the big white paper called which have information for the job

7 respuestas

Drawing

Plot plan or General Plan drawing

Drawing

Mostrar más respuestas
US Army Corps of Engineers

If offered the position, would you accept?

4 respuestas

Yeah and will work extra hard to give my best to the company.

Yes indeed

If offered I would accept

Mostrar más respuestas
Bechtel

Unexpected, but not difficult to answer: Place 4 Items In Order of Priority: Schedule, Cost, Quality, Safety

4 respuestas

They are of equal value...there's no order! When you sacrifice one for another (prioritize) you're opening a door to imbalance and failure. Menos

Safety, Quality, Schedule, Cost

Schedule, safety, quality, cost

Mostrar más respuestas
Viendo 1-10 de 2446 preguntas de entrevista