El proceso duró 3 semanas. Acudí a una entrevista en ID Analytics (San Diego, CA) en sept 2009
Entrevista
Was contacted by a very disinterested HR representative who asked me about my background then read 2 technical questions to me. A week later i was contacted by a very technical person who asked me a wide range of technical questions and was very professional. About 2 weeks later I was invited to go on-site to meet the staff. A few probing questions but mostly to see if it was a fit for the team. Over all a little disorganized but ok process.
Preguntas de entrevista [2]
Pregunta 1
In your cellar there are three light switches in the OFF position. Each switch controls 1 of 3 light bulbs on the floor above. You may move any of the switches but you may only go upstairs to inspect the bulbs one time. How can you determine the switch for each bulb with one inspection??